I began by knitting the back piece. Knitted solely in stocking stitch, I found it frankly, boring. But it needed to be done! Next I got to start on the front - yes! The new cable was fun, and a nice change from the standard two strand version. Once these two pieces were complete, the next job was to sew them together at one shoulder, and pick up stitches to make the large cowl collar. This finished, I could see light at the end of the tunnel. But - disaster! When I went to join the other shoulder I discovered I'd knitted the collar across where I needed to sew the seam. The only way to rectify the problem was to completely undo the whole piece of knitting and begin again. Utterly soul destroying. So I put it away for a day or so until I felt less angry with myself! Collar completed for the second time, the second shoulder was put together, and the capped sleeves begun. This was much more gratifying; sleeves are often deceptively time consuming to knit, and can take almost as long as the body of a jumper. However, these capped sleeves were a mere five rows of rib, and were done in no time. All that was left was to sew up the seams, and await the arrival of my good friend Tom, a week later, whose convenient visit would act as a courier service.
![]() |
| Having a sneaky try on! |
I love the cables on this jumper - I think they're really effective! I will probably steal them for a future project.
I also managed to finish Eliza's sampler, in time for here 0.5th birthday! I did tell her not to expect presents every six months though. Here it is, framed and ready for delivery.
I took it on a visit, along with a box of Christmas presents I hadn't managed to send yet. Better late than never! Although, on reflection six months after Eliza's birth is pretty good, in comparison with my Mum who still hasn't finished my (now 16 year old) brother's sampler yet!

